03-29-2019, 12:27 AM
(03-28-2019, 10:59 PM)trainspotter139 Wrote: the temp road has bus landings on it which to me seems as though they want the buses to use it ASAP due to the impending start of ION and the related GRT changes.
Edit: 15 kVA is the equivalent resistive load of about 15 kilowatts max.
Makes sense about temp road … except that as it happens, it is apparently not being built in the near future. So if the rest of the construction were to happen, it should still be OK for the temp road not to be built.
Thanks for correction on kVA. I think I read a Google result too quickly, without thinking about whether it made sense or whether I was even reading it correctly. 15MW is a lot of power…