For what it's worth, the first two Metrolinx Pilot LRV's are still in Thunder Bay. They were supposed to leave for Millhaven in September.
...I don't think we're getting an LRV under our Christmas tree this year.
Hopefully more after Tom Galloway's visit on November 21st.
Posts: 4,525
Threads: 16
Joined: Aug 2014
Reputation:
138
Posts: 1,101
Threads: 6
Joined: Aug 2014
Reputation:
99
Hopefully we don't have a similar issue here....
https://ca.news.yahoo.com/confusing-inte...01899.html
Coke
Posts: 2,004
Threads: 7
Joined: Sep 2014
Reputation:
125
I worried about that happening with people turning right off of Erb onto Caroline. They need to go out there with a bucket of red paint or something to make it absolutely clear where the road ROW actually is.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
11-13-2016, 07:31 AM
(This post was last modified: 11-13-2016, 08:04 AM by Canard.)
I know I must sound like a broken record for continually bringing it up, but I really hope we'll get markings like this:
I have hope, because this system (Gold Coast Light Rail, or G:Link), was built by many of the same system partners as our system. In fact, the manager at Keolis for ops came straight from Gold Coast.
The one in Toronto in that article is particularly bad because with that median there, and the same "width" of lane (rapidway vs. road), it really is confising to someone not familiar with the area.
1/5 - Saturday, November 12, 2016
I think the crossover at Conestoga is finished off! I wasn't sure what type of construction we'd see, here - but the E-Clips tell us that there will not be another pour to "top up" the concrete pad to bring it up to the rail head height. This is the finished deal.
Here, you can see now both platform canopies and anchor walls have been installed as well.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
11-13-2016, 08:06 AM
(This post was last modified: 11-13-2016, 08:10 AM by Canard.)
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
Posts: 2,004
Threads: 7
Joined: Sep 2014
Reputation:
125
I think the idea with the soil cells is that they allow the sidewalk to be built without the soil below them being first compacted. This will allow for healthier tree root structures as they will be able to spread out fully instead of being inhibited by heavily compacted soil. I may be mistaken, though; other's on here seem to be pretty knowledgable about them.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
5/5 - Saturday, November 12, 2016
...and I don't want to end this on a low note, but it was at this point where I noticed a guy marching around inside the construction zone, snapping away taking pictures. There's a reason it's fenced off. There's a reason the construction crews working inside are trained, and wear Personal Protective Equipment. Please respect the rules (and the law) and don't trespass to take photos. I hope it wasn't a member of our forum. Stay safe out there.
Posts: 4,525
Threads: 16
Joined: Aug 2014
Reputation:
138
11-13-2016, 10:42 AM
(This post was last modified: 11-13-2016, 10:43 AM by KevinL.)
(11-13-2016, 07:31 AM)Canard Wrote: I think the crossover at Conestoga is finished off! I wasn't sure what type of construction we'd see, here - but the E-Clips tell us that there will not be another pour to "top up" the concrete pad to bring it up to the rail head height. This is the finished deal.
This method is also being used for general trackage within the tunnels for Ottawa's Confederation line - rails clipped to a concrete pad.
Might the Fairway crossover get the same approach?
Posts: 10,624
Threads: 67
Joined: Sep 2014
Reputation:
347
(11-13-2016, 10:42 AM)KevinL Wrote: (11-13-2016, 07:31 AM)Canard Wrote: I think the crossover at Conestoga is finished off! I wasn't sure what type of construction we'd see, here - but the E-Clips tell us that there will not be another pour to "top up" the concrete pad to bring it up to the rail head height. This is the finished deal.
This method is also being used for general trackage within the tunnels for Ottawa's Confederation line - rails clipped to a concrete pad.
Might the Fairway crossover get the same approach?
So why did they use this method at Conestoga, and fully embedded method at Cameron?
Posts: 4,525
Threads: 16
Joined: Aug 2014
Reputation:
138
(11-13-2016, 12:41 PM)tomh009 Wrote: (11-13-2016, 10:42 AM)KevinL Wrote: This method is also being used for general trackage within the tunnels for Ottawa's Confederation line - rails clipped to a concrete pad.
Might the Fairway crossover get the same approach?
So why did they use this method at Conestoga, and fully embedded method at Cameron?
The Cameron one is in the middle of a roadway with embedded all around. They still want emergency vehicles, etc to be able to use the right of way.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
I had the same thought, standing at Conestoga - and arrived at the same conclusion, Kevin!
Posts: 213
Threads: 0
Joined: Oct 2014
Reputation:
6
I assume the extra wide sidewalk will facilitate patios, sidewalks sales, etc...but how obtrusive will the trains every few minutes be?
|