In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
It does, as a primary system (or something like that - wireless). Redundant loops are required for safety, and require wiring and an additional control cabinet.
Reply


I wouldn't be surprised if the guy was pulling your leg. Go back and ask someone else
Reply
King and Victoria saw a good deal of late night work last night. Flashes from welding were splashing across the King St faces of 1Vic and Kaufman until at least midnight. It's looking ready for a NB track embed soon.
Reply
(09-13-2016, 08:16 AM)timio Wrote: I wouldn't be surprised if the guy was pulling your leg.  Go back and ask someone else

I spoke with the OnTrack Safety guy stationed in a truck before the "ROAD CLOSED" sign. It was very much a serious response and very much a canned "This is what I'm supposed to say so I don't get in trouble" kind of thing. Once he realized I knew more about what they were actually doing than he did, he just said as much ("I'm really not sure exactly what they're doing. Something with the tracks at the crossing, I guess.").
Reply
It seems a gas main has been breached at King and Frederick. Market Square is currently evacuated.

Update: seems to be fixed to some degree, people are going back in.
Reply
(09-13-2016, 05:32 AM)Canard Wrote: It does, as a primary system (or something like that - wireless). Redundant loops are required for safety, and require wiring and an additional control cabinet.

Thank you.
Reply
Sign on Erb says:
"Erb St. will be reverted to ONE-WAY on/or abour Sept. 20"

So either they are planning on making some serious progress in the next week for Caroline and Erb to re-open on the 20th, or they just want to break people of the temporary habit before it re-opens for real.
Everyone move to the back of the bus and we all get home faster.
Reply


(09-13-2016, 01:31 PM)Pheidippides Wrote: Sign on Erb says:
"Erb St. will be reverted to ONE-WAY on/or abour Sept. 20"

So either they are planning on making some serious progress in the next week for Caroline and Erb to re-open on the 20th, or they just want to break people of the temporary habit before it re-opens for real.

it really should've stayed as two way... at least as a pilot project
Reply
Update on the King/Frederick gas main situation: They have lines running to the surface and a burner is flaming off excess. All looks under control.
Reply
That's going to be amazing if Erb/Caroline is that close to reopening. The curbs were in for the entire intersection (I think) when I went by the other night.
Reply
(09-13-2016, 10:06 AM)Canard Wrote:
(09-13-2016, 08:16 AM)timio Wrote: I wouldn't be surprised if the guy was pulling your leg.  Go back and ask someone else

I spoke with the OnTrack Safety guy stationed in a truck before the "ROAD CLOSED" sign. It was very much a serious response and very much a canned "This is what I'm supposed to say so I don't get in trouble" kind of thing. Once he realized I knew more about what they were actually doing than he did, he just said as much ("I'm really not sure exactly what they're doing. Something with the tracks at the crossing, I guess.").

If it was OTS, then the reason he couldn't tell you is that he actually doesn't know. Those guys provide construction road signs and flagging people....they are also probably the pedestrian ambassadors (if that is the term that was mentioned earlier).
Reply
With the appearance of the speed limit signs along the track would it possible to calculate travel times between stations since the distance and velocity would be known?
Everyone move to the back of the bus and we all get home faster.
Reply
Distance and velocity yes, acceleration no. I mean, we know what the max. accel is of our particular LRV, but you don't know exactly how the operator is going to push the stick.

That being said, yes, some maths could be performed here. Smile Or we could just look at the Baseline Service Schedule which I think already has all this info.
Reply


The baseline service schedule only has suggested departure times from Conestoga and arrival times at Fairview (nothing in between):
http://www.rapidtransit.regionofwaterloo...pdf#page=6
Everyone move to the back of the bus and we all get home faster.
Reply
(09-13-2016, 08:18 AM)Viewfromthe42 Wrote: King and Victoria saw a good deal of late night work last night. Flashes from welding were splashing across the King St faces of 1Vic and Kaufman until at least midnight. It's looking ready for a NB track embed soon.

Yeah, I walked by to get a coffee around noon and they were at least half way done pouring concrete for the NB track and I suspect they're now done. I didn't see what the other direction looked like, but here's hoping paving and reopening the intersection isn't too far off!
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 160 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links