Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Weber Street Reconstruction - College to Union
Still no railings, but now the concrete has been torn up and repoured on the sidewalks! What on earth is going on?

http://www.waterlooregionconnected.com/s...blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr"><a href="https://twitter.com/tomjgalloway14">@tomjgalloway14</a> <a href="https://twitter.com/RegionWaterloo">@RegionWaterloo</a> Still no wood &amp; now the concrete has been torn up. What is going on? Cc: <a href="https://twitter.com/570NEWS">@570NEWS</a> <a href="https://twitter.com/CTVKitchener">@CTVKitchener</a> <a href="https://twitter.com/WR_Record">@WR_Record</a> <a href="https://t.co/cvEfHhAaO7">pic.twitter.com/cvEfHhAaO7</a></p>&mdash; iain (@Canardiain) <a href="https://twitter.com/Canardiain/status/788866343919497217">October 19, 2016</a></blockquote>
Reply


What is going on here?  Are the platforms too close to the....road? Big Grin

   

(This is Weber/Wellington)
Reply
(10-19-2016, 09:13 PM)Canard Wrote: What is going on here?  Are the platforms too close to the....road? Big Grin



(This is Weber/Wellington)

Some of those sidewalk panels appear to be cracked.... warranty repair?

(unless broken by the smashing)
Reply
(10-20-2016, 03:14 PM)JCnb Wrote:
(10-19-2016, 09:13 PM)Canard Wrote: What is going on here?  Are the platforms too close to the....road? Big Grin



(This is Weber/Wellington)

Some of those sidewalk panels appear to be cracked.... warranty repair?

(unless broken by the smashing)

At least one portion appeared to have been cracked by heavy equipment on the sidewalk (as evidenced by tire tracks in the vicinity of the cracking), so maybe the original contractor.

In either case, is it considered warranty repair if its not even completed yet.  There are a few things left to finish.
Reply
<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">Railing caps being installed on Weber St grade separation. FINALLY <a href="https://twitter.com/Canardiain">@Canardiain</a> <a href="https://twitter.com/RegionWaterloo">@RegionWaterloo</a> <a href="https://t.co/DF2B7ci4fC">pic.twitter.com/DF2B7ci4fC</a></p>&mdash; Tom Galloway (@tomjgalloway14) <a href="https://twitter.com/tomjgalloway14/status/793158535328718848">October 31, 2016</a></blockquote>

I don't believe my eyes! Big Grin
Reply
You beat me to it!

   
Reply
Now, let's see if the railings are close enough to the walking portion of the sidewalk - in height and sideways offset - to actually be usable.
Reply


You can see the height in the photos. It looks pretty reasonable.
Reply
(10-31-2016, 04:13 PM)Viewfromthe42 Wrote: Now, let's see if the railings are close enough to the walking portion of the sidewalk - in height and sideways offset - to actually be usable.

I still think it looks more like seating.  The latest pictures again make it look too far from the sidewalk to actually be used as a hand rail.
Reply
I'm more curious what they're going to do about the sag in the flat bar...
Reply
The problem WRT horizontal alignment is there is a huge (very oversized for pedestrian infrastructure) footer on the railing which means you cannot walk that closely to the railing.

The whole thing seems poorly designed though, the "Multi-use trail" is a joke, and it's actually getting worse, the contractors who repaired some of the cracked tiles put sidewalk style groves into the concrete which makes it extremely unpleasant to bike on.....rather, even more unpleasant than it already was.
Reply
At least they are finally connecting that 'sidewalk to nowhere' by the train tracks! New sidewalk appeared to be setting when I was on my way by today.
Reply
The new railings are on, they basically cap the metal rod entirely, no sagging issues.  I didn't get a picture because I was on my run this morning and it was pretty dark, but I'm pretty sure they're finished with them on the west side at least.
Reply


Had a chance to get a hands-on look from the Victoria end. Quite elegant and reasonably functional; though I can see vandals getting sharp objects into their surface easily enough and making that particular type of graffiti.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 2 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links