Posts: 7,845
Threads: 37
Joined: Jun 2016
Reputation:
217
(02-12-2020, 04:50 PM)robdrimmie Wrote: ....
I may have been in the elevator at 55 King between floors three and four taking this picture while you were taking yours. It is timestamped at 2:20.
Edit: The pedestrians don't line up, so they weren't at exactly the same time.
*waves*
I'm probably in one of the windows in that photo...
Posts: 7,845
Threads: 37
Joined: Jun 2016
Reputation:
217
(02-13-2020, 10:21 AM)jamincan Wrote: It's years of being trained that cyclists and pedestrians will just make way for you out of self-preservation, and so not looking at all.
I was going to say this, someone in Toronto (like the university or something) did a study with cameras and found more than half of drivers don't look for peds before turning. As a ped, this is not a surprise, but it's nice for it to be empirically studied and get some press:
https://www.utoronto.ca/news/more-half-t...ning-right
These are the same drivers who will hit a train.
Posts: 1,027
Threads: 6
Joined: Oct 2018
Reputation:
37
Are there any known security cameras that would have caught yesterday's collision on Charles?
Posts: 667
Threads: 0
Joined: Feb 2017
Reputation:
26
(02-13-2020, 10:29 AM)Momo26 Wrote: Are there any known security cameras that would have caught yesterday's collision on Charles? only the cameras on the train as far as I know
Posts: 667
Threads: 0
Joined: Feb 2017
Reputation:
26
(02-13-2020, 12:46 AM)danbrotherston Wrote: (02-12-2020, 04:42 PM)Momo26 Wrote: That's a weird spot. I walk that stretch daily. The Full Circle Foods parking lot exits directly on to the track. Based on where the car's damage was, the fact it was hitched on the tow truck next to the train (but on the road), one could surmise it was about to make a right into the parking lot - all there is, is a sign that says 'no turning, train'. I suppose if not paying close enough attention, could overlook this. There are no barriers that come down like they do on Courtland at the one dealership.
there are many crossings that don’t have a train gate. And drivers are required to check their blind spots before turning. Prior to the LRT the driver would have turned directly across the sidewalk and it would be a pedestrian they ran over instead.
there is no excuse for this low level of attention to driving. It’s a forty foot train that she absolutely had to have passed to hit it (it only travels about 10km/h there).
The trains are 101'1" long. The length doesn't matter since drivers also can't see our 40' buses either Crash involving GRT bus sends one person to hospital
Posts: 813
Threads: 5
Joined: Nov 2015
Reputation:
39
Another collision today, copying one of the first collisions last year turning into the same parking lot on Duke St.
https://www.reddit.com/r/kitchener/comme...reet_stop/
Posts: 608
Threads: 0
Joined: Nov 2016
Reputation:
79
02-20-2020, 12:10 PM
(This post was last modified: 02-20-2020, 12:10 PM by KevinT.)
Thanks. I heard them dealing with it on the scanner during my drive in to work but I never caught the location or vehicle number. That location seems odd as I could swear I heard vehicles turning back south at GRH and so assumed that it was somewhere north of that (unless two things happened this morning). Hopefully more details will emerge...
...K
Posts: 813
Threads: 5
Joined: Nov 2015
Reputation:
39
Does the region have any kind of plan to improve the situation with the CN freight train? I was looking through TransSee logs, and it seems like any ION trip to Conestoga can randomly be held at Waterloo Public Square station for up to 20 minutes after 11pm. It seems like rather poor planning to have a night service that is so unreliable, especially in the winter when riders may be counting on a transfer.
Posts: 4,152
Threads: 64
Joined: Jul 2015
Reputation:
243
02-24-2020, 09:48 AM
(This post was last modified: 02-24-2020, 09:50 AM by ac3r.)
I think all the region can do is negotiate with CN about the use of the spur line during ION operating hours. However, when dealing with freight companies, if you are leasing their lines, they are most likely always going to claim priority over anyone else using the tracks. CN is a hard company to negotiate with, so I'm not sure what the region can really do but keep asking. But, just due to the logistics of freight train transportation, it's real hard to make any deal if there is a load of cars sitting in Elmira that they need to get onto the mainline so it can be sent out to whoever buys the chemicals from Elmira. They will most likely not hold up a freight train that is destined to go to Detroit, Chicago, Vancouver etc just so the ION isn't delayed 20 minutes. That is tens or hundreds of thousands - if not millions of dollars - in freight where a delayed ION is basically pocket change in fares.
ION Phase 2 was originally planned to use the CP tracks into Cambridge, but it seems they realized that it would be a real problem due to the frequency of CP trains coming from Toyota and various industries in Guelph, and decided to build a series of viaducts instead, because CP wouldn't hold up their trains so the ION can be running on time.
Posts: 2,004
Threads: 7
Joined: Sep 2014
Reputation:
125
Doesn't the Region own the Spur Line?
Posts: 4,443
Threads: 1
Joined: May 2015
Reputation:
204
(02-24-2020, 09:48 AM)ac3r Wrote: ION Phase 2 was originally planned to use the CP tracks into Cambridge, but it seems they realized that it would be a real problem due to the frequency of CP trains coming from Toyota and various industries in Guelph, and decided to build a series of viaducts instead, because CP wouldn't hold up their trains so the ION can be running on time.
Cite? My understanding is that the previous proposed Phase 2 route was to run immediately parallel to the CP tracks, not actually share trackage.
Posts: 4,443
Threads: 1
Joined: May 2015
Reputation:
204
(02-24-2020, 10:54 AM)jamincan Wrote: Doesn't the Region own the Spur Line?
Yes, but the freight still has to be allowed to get through.
I wish I understood more about what takes the time however — it’s not that far to Elmira; I would have thought that 4 hours (01:00-05:00) would be enough time to get to Elmira, switch cars, and get back. I don’t know if they go more slowly than I assume (which could be fixed by improving the track), or if the switching is just more complicated and time consuming than I imagine (not so easy to fix).
Posts: 813
Threads: 5
Joined: Nov 2015
Reputation:
39
02-24-2020, 11:19 AM
(This post was last modified: 02-24-2020, 01:45 PM by Bob_McBob.)
The region owns the spur line and has complete control over scheduling. CN has to wait for authorization from the control centre at the derail every time they run a train. I don't know what specific rules are being followed in terms of LRVs sharing the line with freight. The way they do it right now, 2-3 nights a week the freight train essentially eliminates a scheduled ION trip at a random time between 11pm and midnight.
I had heard about these delays in passing from ION riders, and I finally took the time to check it out on TransSee. On one particularly bad night (Jan 16), 504 was held at Waterloo Public Square for 25 minutes, which meant 510 had to be held at Allen and also ended up 15 minutes late. These delays are slowly made up all the way to Conestoga and back to Fairway because they're so long, but on this night even that wasn't enough, and it really messed up the schedule. Sometimes Fairway-bound LRVs are held at Waterloo Park while the freight train is on the line, but they're released before the Conestoga-bound LRV so it doesn't seem like the freight train has to completely clear Northfield before ION traffic resumes.
I don't know what is a reasonable solution here. I doubt CN would be willing to work within the limited time ION is out of service (~2am to 4:30am), especially if it meant running the train back and forth on subsequent nights. Integrating the train into the schedule would require CN to follow an actual fixed schedule, but right now they basically send a train whenever they feel like it. It seems like they try to keep the LRVs held at Waterloo Public Square for 15 minutes or less so it at least doesn't affect the next trip, but the random nature of CN's scheduling means you simply cannot rely on ION for connections at this time of night, and that is really unacceptable.
Posts: 7,845
Threads: 37
Joined: Jun 2016
Reputation:
217
(02-24-2020, 10:59 AM)ijmorlan Wrote: (02-24-2020, 10:54 AM)jamincan Wrote: Doesn't the Region own the Spur Line?
Yes, but the freight still has to be allowed to get through.
I wish I understood more about what takes the time however — it’s not that far to Elmira; I would have thought that 4 hours (01:00-05:00) would be enough time to get to Elmira, switch cars, and get back. I don’t know if they go more slowly than I assume (which could be fixed by improving the track), or if the switching is just more complicated and time consuming than I imagine (not so easy to fix).
First of all, this is simply not true, the region could say no to freight. It wouldn't be a good idea and it would probably result in expensive lawsuits but there is nothing protected about freight.
That being said they absolutely could force them to do it after hours. If four hours isn't enough time to do the drop (which seems strange but I'm not a railway operator) then they could do it over two days. Definitely more expensive. But not impossible.
Posts: 1,558
Threads: 13
Joined: Aug 2014
Reputation:
138
(02-24-2020, 12:22 PM)danbrotherston Wrote: First of all, this is simply not true, the region could say no to freight. It wouldn't be a good idea and it would probably result in expensive lawsuits but there is nothing protected about freight.
The Region's agreement with CN was in a council report. The agreement very specifically includes the region's right to terminate freight service at contract renewal, which is every few years, if it interferes excessively with ION operations.
I think the reason they won't is that ending CN service to Elmira would effectively force the Chemtura plant to close, and everyone to lose their job. The news story would then be "ION causes loss of hundreds (thousands?) of jobs" .
Chemtura is I think the biggest employer in Elmira.
|