06-24-2021, 01:25 AM
(06-23-2021, 01:50 PM)KevinL Wrote: Looks like the Guelph slowdown is almost a thing of the past - the new crossings east of the station will be tested by a dry run on Sunday, with speeds up to 80 km/h (up from the former 16!). Actual passenger trains should hit those speeds in the fall.That is certainly good news. I can jog faster than the train goes through this section.
https://blog.metrolinx.com/2021/06/23/go...K84vzPlNtk