Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION Stage I: what would you do differently?
#62
(05-15-2021, 09:57 AM)ac3r Wrote:
(05-15-2021, 08:25 AM)ijmorlan Wrote: Which is it, did we waste money or not spend enough?

I think we spent too much for what we got. We could have spent less and got close to the same, or more and got a system that would have been truly independent, not relying on the very roads we all claim to despise here, that goes just as slow as cars at times and has to stop at red lights to let them pass.

You make some good points in your post. And cut-and-cover is indeed cheaper -- but the costs of underground or elevated stations would have also been far higher than the fairly basic ones we have now. And accessibility would have been worse.

However, my main issue is the bolded portion above: the design of the system does not dictate the speeds we have today, nor does it require stopping at red lights. The system can be speeded up by relaxing speed limits and providing traffic light priority. And an elevated/buried system would still need the same amount of time for dwell times, deceleration and acceleration, though it might have been able to smooth out some turns to make them faster.

Summa summarum: As our population grows and the transit usage grows, our current LRT can certainly be made to run significantly faster -- and that's without any substantial additional capital investment.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION Stage I: what would you do differently? - by tomh009 - 05-15-2021, 08:07 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links