(03-29-2021, 10:23 PM)tomh009 Wrote:(03-29-2021, 04:45 PM)danbrotherston Wrote: I completely agree, and I think the region is planning on rebuilding that entire section, so it's likely that would be in the cards.
My proposal was based around the idea that this could be retrofitted into the existing design. It would be very hard to widen the sidewalks in that context because the storm drains would be covered by the sidewalk extension.
Ahh, good point! I didn't think of the storm drains.
Some parts of the road surface are in pretty rough shape (Arrow 2 construction did no favours in that regard). When is the region planning to do the rebuild?
It's been delayed, I think it was 2022-2023 now it's like 2024.