02-23-2021, 05:49 PM
(02-23-2021, 03:56 PM)Nextasy Wrote: Not sure if it was mentioned already, but looks like the Conestoga Mall terminal is getting a reconfig. RFP has been issued.
Trips at the station in 2019 were up to 10,000/day, from 6,000 pre-LRT. The roadway and sidewalk capacity is insufficient, and much more pedestrian thru-traffic exists now due to ION.
Is this a regional RFP, for GRT? Or a city RFP, for the sidewalks and roads? I'm not clear whose responsibility this is.