10-23-2020, 09:45 PM
(10-22-2020, 03:00 PM)JCnb Wrote:I apologize you appear to be right. I could swear I saw a document at one point that had full access planned for the interchange. It was likely pre Ford government though so maybe that changed, or maybe it never was and I'm going insane(10-19-2020, 04:36 PM)Bjays93 Wrote: Franklin Rd bridge yes. The interchange has not though. It will be all directions following the reconstruction. Right now it only has an on ramp westbound and a off ramp eastbound.
(That is unless plans have changed recently)
The Franklin ramps are to stay as they are as far as I know, realigned to work with the widened highway only.
https://docs.google.com/viewerng/viewer?url=http://highway401-hespeler-townline.ca/wp-content/uploads/2014/05/tesr-preferredplan-phase1.pdf&hl=en_US