10-16-2020, 02:42 PM
(10-16-2020, 01:08 PM)dtkvictim Wrote: I don't have time to look through the construction drawings, but the renders and maps on the information sheet look like a huge step in the right direction (even if imperfect).
Does anyone know what the planned road reconstruction is on Benton from Courtland to Charles? I don't understand why it's 4 lanes, and it could potentially be a great connection to the Mike Wagner green and IHT if they put in cycling infrastructure there. Although it will probably always lack connecting infrastructure from Charles/Frederick because of the LRT.
The region is planning work, but has not started designing yet. I fear if left to their own devices, it will be mediocre...even if they do narrow it.
I am in the middle of my own project on this topic, and I will post soon