05-22-2015, 10:01 AM
(05-22-2015, 09:58 AM)timio Wrote: From the IHT Twitter account on Wednesday:
Quote:Watch for construction! I'm being repaved & widened today to 3m in @citywaterloo. Conduits also being added to light the trail in the future
One of the advantages of solar powered led lighting is that it requires no conduit. It'd be sad if the "intelligent city" of KW were to use last century's technology in this location.