01-04-2020, 04:54 PM
(01-04-2020, 01:50 PM)Bytor Wrote:(12-31-2019, 06:11 PM)clasher Wrote: Main disadvantage is the lack of tracks east of Havelock. Would be able to build it for higher speeds if they laid new ones.
I'd say that the main disadvantage of their HFR route through Peterborough is that it will basically end up being a point-to-point route serving only Toronto and Ottawa. if they want to get all spendy and build new tracks. like they have fo for HFR, the lake shore route would be far more useful to far more people.
I don't know if there is enough room and if there isn't the land costs would be a lot more along the lakeshore. It definitely would serve more people though.