09-24-2019, 01:11 PM
(09-24-2019, 09:32 AM)tomh009 Wrote:(09-23-2019, 10:31 AM)clasher Wrote: It seems like they are really dogging it on the section south of Queen. I've been through there a bunch of times during regular working hours and there isn't a soul in sight.
There was a long gap between the two layers of asphalt being laid, presumably to allow the first layer to cure.
Asphalt doesn't really need to cure the way concrete does, especially for weeks at a time. Roads are paved and re-opened to heavier traffic without as much time.