09-22-2019, 10:31 AM
It looks like they paved over the dividing line to cover up the existing line that was water blasted off, as well as the two new lines they put down. Better to pave over the existing lines and put down a new set of clean lines to avoid any confusion. It also doesn't seem like the bike lanes on Erb are done yet. I recall that there will be some physical separation in the buffer space.