07-11-2019, 06:15 AM
They're in the final stretches of work. I believe I heard somewhere it is supposed to open around the beginning of August. I believe there was a project map floating around at one point that showed that the configuration was going the be 8 lanes from Hespeler east, and that the Hespeler Rd. on-/off-ramps would become additional lanes to Hwy 8 for a total of 10 lanes in that stretch. The outer two lanes would then turn into the ramps for Hwy 8 with 6 continuing west. HOV lanes are planned, but the MTO seems not to implement HOV lanes until a more substantial stretch is ready (see the 401 west of 410).