06-02-2019, 06:06 PM
(05-02-2019, 08:23 PM)danbrotherston Wrote: The very long term closed section of the IHT has some progress...it....isn't....good.
This isn't a final design, so it's possible it may be improved...I'm hoping they build a nice straight non-retarded MUT to the left of the fence--I would still question the skills of whatever person designed the sidewalk as is--I see no situation, where it is a well designed sidewalk.
They've laid topsoil on the other side of the fence now, with a very clear 3 metre wide strip that is still bare gravel. It definitely looks like there will be a straight asphalt trail with several connections to the concrete path.