05-21-2019, 05:00 PM
(05-21-2019, 02:50 PM)KevinL Wrote: No doubt all pre-arranged. They can have LRVs on the northbound tracks (except in Uptown) during that.
Southbound track, except for between the crossover at the Perimeter Institute and the Waterloo Town Square parking lot, where it is indeed the northbound track. You can actually see that the ties on the freight track are closer together than on the LRT-only track.