03-15-2019, 08:51 PM
(03-15-2019, 08:01 PM)Canard Wrote: Stage 2 Consultation Package is now out:
http://rapidtransit.regionofwaterloo.ca/...Access.pdf
Page 9 of the PDF is the meat of things - the preferred alignment is diagonally across the Queenston block, then running alongside Eagle St. The latter is to allow a simpler crossing of the CP line further up the riverside (a bridge for just the LRT, not the road as well).