(09-27-2018, 12:22 PM)Canard Wrote: In a nutshell, this picture basically explains the primary reason for the current delays beyond the initial production startup hiccups:
Guess who didn't hold up their end of the deal?
Does “B/O” stand for “back ordered”?
I noticed the vehicle on display at the UW stop just had a hole there. I think they should make a point of having that label installed on all the vehicles that are still lacking the equipment. It won’t make much difference but whenever a member of the public gets a chance to see the console they should see that the gap is Metrolinx-related.