09-26-2018, 10:10 PM
(09-24-2018, 02:03 PM)danbrotherston Wrote:(09-24-2018, 12:09 PM)tomh009 Wrote: In that cost range, the construction is much more reasonable. Is that to get a MUT built, in lieu of a sidewalk?
The construction on Sydney could involve building a MUT on the boulevard--new pavement.
The construction on Bedford would involve paint, and flex posts only, reusing existing pavement only.
Almost everyone writing here and in the newspaper are ignoring an important part regarding the accessibility of our livable environment for all our citizens, required in Ontario law.
If the City builds a road separated MUT on the Bedford Road portion then everyone in the city wins except the 14 homeowners who believe their private street should not have cyclists, pedestrians and persons with mobility on "their street".
Their moto is go away and leave us alone. Ask them if they want a legally required sidewalk allowing accessibility, to be built, and, everyone knows what their answer will be.