09-26-2018, 11:50 AM
The airport documents I have seen showed a spur line running down to the airport... stopping at the new terminal building. (Which would be built on the north side of the property, near the meat packaging plant). The airport's master plan calls for this being considered once we hit a million pax a year. Still a way off from there.
While the passenger numbers are low from the standpoint of having a full time bus route, there is only ONE scheduled flight per day at YKF right now. ALL of those passengers are arriving within the same hour, and departures would be in a similar time frame... a "School Special" type service could work well.
Coke
While the passenger numbers are low from the standpoint of having a full time bus route, there is only ONE scheduled flight per day at YKF right now. ALL of those passengers are arriving within the same hour, and departures would be in a similar time frame... a "School Special" type service could work well.
Coke