05-24-2018, 09:31 AM
(05-24-2018, 09:12 AM)Coke6pk Wrote:(05-23-2018, 05:18 PM)BrianT Wrote: The new station at King and Victoria might have level boarding. It will be a few years though.
There are 3 steps INSIDE the train... we need new rail cars before we can have true level boarding.
Coke
These steps are optional--that is, the attendants activate them when the train pulls into the station. The top portion of the door can open to provide level boarding into the train. But this door is at a different level from those of the GO Trains (but I suspect the same as the UPX and other mainline rail trains--Quebec AMT trains have both high doors and low doors).