04-20-2018, 02:45 PM
(04-19-2018, 12:53 PM)ijmorlan Wrote:(04-19-2018, 12:43 PM)robdrimmie Wrote: There's something in the contract that allows them to get away with only paving a strip that is perhaps a foot-and-a-half wide, and this strip does not need to be connected to a sidewalk at all. It is absurd.
Do you mean clearing, rather than paving?
Agreed regardless!
I did, thank you. I think I had intended to add something about them also being able to ignore "down to the pavement" and just conflated several thoughts together poorly.