03-24-2018, 11:33 AM
That's only if they do one segment at a time.
If they do the entire stretch, from the fresh asphalt under the GEXR tracks (near Catalyst137) down to the south side of Queen, at once the detour becomes:
Or:
Or:
If they do the entire stretch, from the fresh asphalt under the GEXR tracks (near Catalyst137) down to the south side of Queen, at once the detour becomes:
Or:
Or:
Everyone move to the back of the bus and we all get home faster.