01-12-2018, 10:05 PM
(This post was last modified: 01-12-2018, 10:08 PM by Pheidippides.)
The bid documents for the IHT wayfinding signage and central section reconstruction are up; hopefully the contracts were thought through better than the snow clearing contract.
Includes the trail connection near West Ave along the creek to Victoria Park.
Decently detailed map in the reconstruction documents. Work to be completed by July 15, 2018! 3.6m most of the way as far as I can tell. Looks like the Queen crossing is being redone. I think I count upwards of 70 tree removals.
Includes the trail connection near West Ave along the creek to Victoria Park.
Decently detailed map in the reconstruction documents. Work to be completed by July 15, 2018! 3.6m most of the way as far as I can tell. Looks like the Queen crossing is being redone. I think I count upwards of 70 tree removals.
Everyone move to the back of the bus and we all get home faster.