11-30-2017, 11:34 PM
(This post was last modified: 11-30-2017, 11:35 PM by trainspotter139.)
(11-30-2017, 11:13 PM)Pheidippides Wrote: I believe 502 was loaded Sept 25 and unloaded Oct 3; so 9 days.
Depends how close they can load it to the actual shipping date.
yeah CN didn't pick it up until Wednesday Sept 27th and it got to the region on the 29th but GEXR doesn't run a train from Fri-Sun so it couldn't be brought up the Waterloo Spur until Monday October 2nd. The local switcher for Millhaven only runs 3 days a week so when this one gets picked up is up in the air.