10-21-2017, 07:44 PM
(10-21-2017, 12:19 PM)Pheidippides Wrote: Looks like the City of Kitchener has "improved" their website rendering previous links useless and providing a cryptic set of directories to navigate instead.
Here is the link to the original staff report.
Here are the minutes from that meeting.
CBC article.
Record article 1.
Record article 2.
Looks like is was passed and was to be built as part of the Balzer creek rehabilitation in 2017.
Thank you!
We went and checked this out this afternoon. Here are some photos of the section which seems to have been built this year; from Homer Watson to Fallowfield Drive:
From the West side of Homer Watson, looking East. You can see they've done the "London Style" of underpass for the trail under the bridge! Love these.
On the East side of Homer Watson, looking East.
About halfway between Homer Watson and Fallowfield, there's a new boardwalk.
Construction quality is absolutely top notch; mitred cuts, and filleted edges on all tactile surfaces. Fantastic!