09-06-2017, 09:37 PM
https://www.therecord.com/news-story/754...-drags-on/
Speculation, or is this delay hot-off-the-press?
Hoping the local infrastructure (ramp work) keeps moving ahead, should be something they can work on independent of the overall schedule.
Side note: Until something viable is set up on Wellington I don't see how they can shut down Victoria st bridge for a year. Frederick st bridge will be a bottle-neck unless they open it back up to 4 lanes again.
Speculation, or is this delay hot-off-the-press?
Hoping the local infrastructure (ramp work) keeps moving ahead, should be something they can work on independent of the overall schedule.
Side note: Until something viable is set up on Wellington I don't see how they can shut down Victoria st bridge for a year. Frederick st bridge will be a bottle-neck unless they open it back up to 4 lanes again.