07-10-2017, 08:51 AM
(07-10-2017, 07:33 AM)MidTowner Wrote: The thing to do now is to evaluate the Maple Grove routing against the other alternative always on the table, 'Do Nothing.'Or perhaps even consider a third choice. Run it from Fairview to Sportsworld or Shantz Hill and allow the cambridge bus routes to connect there, and then run it down Fountain past the two Conestoga College campuses campuses closing the loop at Block Line or Fairview. Would serve the college, a large industrial and residential area and allow for more effective connection with Cambridge than currently exists. Realize it won't happen and that the Fountain street bridge would need even more reconstruction but always thought it a huge loss that Conestoga wasn't seriously considered for a rail connection. Maybe Phase 3...
Garth