05-23-2017, 08:19 PM
Allen and GRH were getting their tactile edges and final concrete surfaces today.
The GRH has this oddity at its north end:
So the platform levels off at track height, but there are no curb cuts on the either side of the road (inner or outer). So the only way to "legally" enter the platform coming from Union is to walk all the way to the south entrance at Pine.
The GRH has this oddity at its north end:
So the platform levels off at track height, but there are no curb cuts on the either side of the road (inner or outer). So the only way to "legally" enter the platform coming from Union is to walk all the way to the south entrance at Pine.
Everyone move to the back of the bus and we all get home faster.