05-19-2017, 12:35 AM
(This post was last modified: 05-19-2017, 12:35 AM by Pheidippides.)
They want the London to Toronto section by 2025, but the EA could be 4-6 years? That does not leave a lot of construction time especially with the large number of grade separation projects still remaining in this region alone.
Everyone move to the back of the bus and we all get home faster.