03-29-2017, 09:16 PM
2/5 Sunday, March 26, 2017
Curve at Hayward/Courtland. Note the temporary (?) sidewalk connection there on the far side with asphalt.
Pedestrian crossing arms at Courtland/Hayward.
A sidewalk is going on on the Southwest side of the Rapidway, along Courtland, between at least Block Line and Shelley. Maybe you guys will get your sidewalk after all.
Crossing arms galore at Block Line/Courtland. Note the one in the centre of the frame is to inhibit right turns when heading South on Courtland, turning onto Block Line. Interesting setup.
More pedestrian crossing arms at Block Line/Courtland.
Curve at Hayward/Courtland. Note the temporary (?) sidewalk connection there on the far side with asphalt.
Pedestrian crossing arms at Courtland/Hayward.
A sidewalk is going on on the Southwest side of the Rapidway, along Courtland, between at least Block Line and Shelley. Maybe you guys will get your sidewalk after all.
Crossing arms galore at Block Line/Courtland. Note the one in the centre of the frame is to inhibit right turns when heading South on Courtland, turning onto Block Line. Interesting setup.
More pedestrian crossing arms at Block Line/Courtland.