Wooden poles on east side of King between William and Willis have been removed. Sidewalk still needs to be fixed.
Additional noise exemption asked for from February 1, 2017 through December 31, 2017:
"Work for 2017 mostly consists of deficiency work, surface asphalt placement and works on the LRT system, including but not limited to overhead and underground wire, the LRT stop works and finalizing LRT track."
http://www.kitchener.ca/en/Calendar/Down...b6d3dab94b
Additional noise exemption asked for from February 1, 2017 through December 31, 2017:
"Work for 2017 mostly consists of deficiency work, surface asphalt placement and works on the LRT system, including but not limited to overhead and underground wire, the LRT stop works and finalizing LRT track."