02-22-2017, 04:11 PM
(02-22-2017, 03:40 PM)welltoldtales Wrote: This link makes it pretty clear that Bombardier disputes that. Has moved under it's own power and ready to run.
https://twitter.com/BenSpurr/status/834453371000070144
Bombardier can override the computer manually to test the motors before shipping but the onboard computer needs software to integrate it with the customer selected train control and signalling systems. The onboard computer will lock out control otherwise because it will think there is something wrong.