11-22-2016, 11:29 AM
(10-07-2016, 09:32 PM)bpoland Wrote: Well the above post says the sidewalks are going on the "commons side" -- isn't that the north side of Jubilee? My point was that sidewalks aren't necessary on the south/lake side since there is an existing pathway (not sure why they didn't just say that instead of the meandering thing). A sidewalk on the north side ( which is what I think they are doing) will definitely be useful.
The sidewalk construction has started -- and it's indeed going in on the north side of Jubilee. A little bit surprised by the winter construction, curing the concrete in the winter is much more of a nuisance than in warmer months.