09-16-2016, 03:33 PM
Mostly just freshly dumped dirt along the edges of road and sidewalk to bring it level for the hydro-seed or sod. A few random single sidewalk panels had been poured today as well.
I was down as far as the north side of the grade separation at Moore this afternoon. That hole gets gets longer and wider and deeper and cluttered. There is no way wellington reopens by the end of September and the planned late-October opening for Moore seems unlikely too - but then again I am always amazed how quickly things can come together. Hoping I am wrong!
I was down as far as the north side of the grade separation at Moore this afternoon. That hole gets gets longer and wider and deeper and cluttered. There is no way wellington reopens by the end of September and the planned late-October opening for Moore seems unlikely too - but then again I am always amazed how quickly things can come together. Hoping I am wrong!
Everyone move to the back of the bus and we all get home faster.