(08-24-2016, 10:42 AM)KevinL Wrote: Lots of activity around future Queen station this morning, but forms are still not at the pourable stage.
The Benton side of the work zone is now getting under way; a big front-end loader was tearing up the asphalt. A small strip remains between fences as a pedestrian path, about where the King crosswalk had been.
Concrete now poured between the track and the curbs in front of Full Circle. It looks like they can finally install new concrete and ashphalt for Full Circles's driveway and parking lot.