08-11-2016, 11:37 PM
(08-11-2016, 10:39 PM)tvot Wrote: Some daylight photos of the King @ Allen bridge:
Which is now gone. They removed it when they pulled the tracks into place for the curve from King to Allen. Concrete was poured today for the northbound side through the intersection of King & Allen.
I didn't get a photo, but there was much heavier rebar on the concrete sections withing the intersection than the sections that will only see LRT traffic. For the intersections there is a heavy C-Shaped section of what looks like 3/4" rebar, where as the straight sections have just the grid of 1/2" or so. I wonder how long roads would last if we built them out of concrete with that kind of reinforcement.