07-20-2016, 09:04 AM
The anchor wall at Charles and Gaukel is going up as we speak.
Two guys have been outfitting the lubricator this morning for the Francis-to-King turn this morning. The frame of the boxes that open to the surface are sitting in midair, with some PVC-looking pipe running under the tracks from them to some other location.
Two guys have been outfitting the lubricator this morning for the Francis-to-King turn this morning. The frame of the boxes that open to the surface are sitting in midair, with some PVC-looking pipe running under the tracks from them to some other location.