07-07-2016, 10:14 AM
Further south on Charles, lots of activity again ...
Getting ready to pour the concrete pad between the two tracks (is there a name for this?) at Cedar.
In front of Cameron Heights, the concrete strip next to the curb now poured ...
... although someone stepped in it before it cured!
Between Kent and Borden, the forms are almost ready for the concrete for the "EB" track to be poured.
Getting ready to pour the concrete pad between the two tracks (is there a name for this?) at Cedar.
In front of Cameron Heights, the concrete strip next to the curb now poured ...
... although someone stepped in it before it cured!

Between Kent and Borden, the forms are almost ready for the concrete for the "EB" track to be poured.