05-23-2016, 10:38 PM
Not sure of the progress of Allen when the last pictures posted were taken, but as of today (at least), there were curbs and pavement, as well as most sidewalks. The intersection was driveable as well, minus the portion blocked by track being laid.
![[Image: UDhdWsN.jpg]](http://i.imgur.com/UDhdWsN.jpg)
New curbs are also in on the Northern side of the Uptown parking lot. Nothing on the southern side of the Ion / CN ROW yet, and track has yet to be touched.
![[Image: du5c85u.jpg]](http://i.imgur.com/du5c85u.jpg)
The Caroline / Erb intersection as a whole has yet to be touched, minus a small pit in front of the church on Erb.
![[Image: O5gGW3R.jpg]](http://i.imgur.com/O5gGW3R.jpg)
Strangely enough, there were crews working today, Victoria Day, at the King / Francis intersection. Even stranger still, they were still working at 9pm! Do these guys ever get a break?
![[Image: UDhdWsN.jpg]](http://i.imgur.com/UDhdWsN.jpg)
New curbs are also in on the Northern side of the Uptown parking lot. Nothing on the southern side of the Ion / CN ROW yet, and track has yet to be touched.
![[Image: du5c85u.jpg]](http://i.imgur.com/du5c85u.jpg)
The Caroline / Erb intersection as a whole has yet to be touched, minus a small pit in front of the church on Erb.
![[Image: O5gGW3R.jpg]](http://i.imgur.com/O5gGW3R.jpg)
Strangely enough, there were crews working today, Victoria Day, at the King / Francis intersection. Even stranger still, they were still working at 9pm! Do these guys ever get a break?