04-26-2016, 11:33 AM
(04-26-2016, 10:53 AM)The85 Wrote: This is because the future HOV lanes in the express are not constructed. The MTO is waiting to open the HOV lanes until the next phase of widening of the 401 in Mississauga from Hurontario to the Credit River is complete in 2019.
Or rather, they are constructed, but they're waiting until they are longer than 1.5km before activating them.
Though, I was driving in Toronto rush hour last week, and I sure would have loved those HOV lanes, even in their truncated state. Those alone would have skipped about 10 minutes of crawling towards the Great Merge.