12-23-2015, 02:13 AM
Interesting. I guess it's a longer timeline than I expected. When's the Franklin extension past Myers being done? That was supposed to include 2 more roundabouts (One at Myers and one at where the extension ends).
They've got detailed technical drawings of the 6 Year 1 roundabouts on the region's site. Anyone know of the existence of the the Year 2 roundabout drawings? Curious what they'll look like at Avenue, where space is very limited, and at Dundas, which is a moderately big intersection.
They've got detailed technical drawings of the 6 Year 1 roundabouts on the region's site. Anyone know of the existence of the the Year 2 roundabout drawings? Curious what they'll look like at Avenue, where space is very limited, and at Dundas, which is a moderately big intersection.