12-16-2015, 12:22 AM
(12-15-2015, 08:57 PM)GtwoK Wrote: ...spots like King St that have been paved for months don't have sidewalks yet.
I noticed that between Union and William, they've laid some (temporary) asphalt sidewalks, and I gotta say, they look wonderfully wide. Considering they've forgotten to design on-road cycling infrastructure, I almost want them to declare them multi-use.
Quote:Charles is also paved in both directions from Benton to Cedar. Completely driveable now. Crossing Eby has been closed — the plans show this as no longer being a through street, but the shape of the curbs say it is?
I was thinking that this might be an emergency services access thing.