10-10-2015, 10:18 AM
I'll do this in batches again since I can only attach 5 images per message. First up, some shots of the OMSF. Not too much "visible" work going on over the last few weeks, but the lights are on in the various buildings, so they're likely doing a lot of interior outfitting and so on.
I think this demarkation is where the switch will be installed to head into the shops.
I think this demarkation is where the switch will be installed to head into the shops.