(Today, 12:28 AM)ZEBuilder Wrote:Anymore information on which bridge rehab/ interchange redesign?(Yesterday, 11:00 PM)SammyOES Wrote: That makes sense. Thanks.
I saw one weird summary of a contract (tender?) that seemed to say completion was in 2029. Do you know if that is the whole bridge or just the design or something in between or just some nonsense I misinterpreted?
From what I know design of the bridges should be done this year, the contract is tentatively set to go to tender next year (2027) as for completion of the bridges it's likely 2 to 3 years after the contract is awarded. The redesign of the Hanlon end of 7 is expected to be completed by the end of 2030, that design tender (I posted about it a few posts ago) has 2029 as the program year. That's really been the only thing for this stretch of 7.
There's a handful of contracts coming up for resurfacing of the expressway out to New Hamburg and then up to the north end of Waterloo, along with bridge rehab (including interchange redesigns) and a rather complicated culvert replacement which are all coming in the next few years but most of that was 2027/2028.