08-08-2024, 07:07 AM
(08-07-2024, 01:11 AM)danbrotherston Wrote:(08-06-2024, 10:31 PM)tomh009 Wrote: Four pedestrian/cycling bridges are included. Those are surely far more expensive than 2.1 km of MUT.
Yes but 70m per km is expensive for LRT. Even with bridges this is way too much for cycle infra. Also, why 4 bridges in 2 km?
The Railpath runs beside the tracks, which pass over the crossing streets on bridges.