07-15-2024, 09:17 AM
It seems like the city has already investigated the possibility of grade separation at Lancaster St, going back to at least 2018. A more detailed article from Sept 2022.
A follow-up document here, saying that the study would be wrapping up in 2024:
A study was initiated in 2022 to consider the feasibility of constructing a grade separation to replace the Lancaster Street/Metrolinx railway level crossing between Wellington Street and Victoria Street. The construction of such a structure would include pedestrian and cycling facilities. This study is expected to be completed in 2024.
So I imagine we should be hearing something more concrete about this, relatively soon.
A follow-up document here, saying that the study would be wrapping up in 2024:
A study was initiated in 2022 to consider the feasibility of constructing a grade separation to replace the Lancaster Street/Metrolinx railway level crossing between Wellington Street and Victoria Street. The construction of such a structure would include pedestrian and cycling facilities. This study is expected to be completed in 2024.
So I imagine we should be hearing something more concrete about this, relatively soon.