06-17-2024, 09:33 AM
This is for the stuff surrounding Metrolinx portion of the project which I would assume needs to be done first or at least at the same time.
Theirs includes anything in the rail corridor such as the platforms and the Waterloo St active underpass..
Theirs includes anything in the rail corridor such as the platforms and the Waterloo St active underpass..